Conservatory production and installation takes about 25–30 days on average, including glass supply and paint; it is handed over within a month. A survey and measurement come first, and a written quote follows the same or next day.
Short answer
A conservatory is made to measure, so it is not delivered at once like a ready product. In the field, production and installation take about 25–30 days on average, including glass supply and paint, so it is handed over within a month. The survey and quote stage is not included. As an authorised Albert Genau manufacturing dealer, we make and install with our own team.
Process and timings
| Stage | What happens | Time |
|---|---|---|
| 1. Survey and measurement | Area, floor, roof and side façades measured | By appointment |
| 2. Written quote | System and options given in writing | Same or next day after the survey |
| 3. Production and installation | Aluminium frame, glass roof and side façades; paint and glass supply included | About 25–30 days on average |
| 4. Handover | Checks and use instructions | Within a month |
What affects the timing
- Permissions and approvals: in apartments or estates the management plan, owners' approval and the municipality's view may be needed; add them to the timeline (permit guide).
- Floor preparation: if the floor is not ready, plan it first (floor choices).
- Size: the smallest conservatory is 15 m²; larger areas are scheduled accordingly.
For all the steps see how is a conservatory built? To get a firm schedule for your space, request a free survey.