A bioclimatic pergola needs a concrete floor; the legs are fixed with dowels and anchors and can also be tied to a wall. The power point is set at the survey and a voltage regulator is recommended. Production takes about 25 days and installation 1 day.
Short answer
Two things must be ready for a bioclimatic pergola: a concrete floor and a sound electrical supply. The legs are fixed to the floor with dowels and anchors and can also be tied to a wall, which is why the floor must be concrete. We set the power point together with you at the survey.
Preparation checklist
| Topic | What is needed |
|---|---|
| Floor | A concrete floor is required; legs are fixed with dowels and anchors. |
| Wall | The pergola can also be fixed to a wall; the wall is assessed at the survey. |
| Front width | At least 1.5 m of front width, on a balcony as well as a roof. |
| Size limit | One unit is at most 36 m² (10 m deep, 7.80 m wide); larger areas are combined. |
| Tall legs | Above 3.5 m the legs are reinforced. |
| Electricity | The power point is set at the survey; unstable voltage harms electronic boards, so we recommend a voltage regulator. |
| Time | Production about 25 days (package), installation 1 day. |
Common mistakes
- Leaving the floor to last: without a ready concrete floor installation day slips; settle the floor at the survey.
- Forgetting electricity: the motor needs a power point; opening a line later is costly.
- Skipping permission: in apartment blocks and estates the management plan and owners' approval may be needed; rather than a firm ruling, ask your municipality and management. Details: is permission needed?
Installation steps are in the installation guide, leg fixing in how pergola legs are mounted, and voltage in motor and electronics faults. We work as an authorised Albert Genau manufacturer dealer; see our dealer page. Fill in the form for a free survey; we give a written quote the same or the next day.