Installing a bioclimatic pergola starts with a survey and load calculation; production takes about 25 days, on-site installation usually takes 1 day and is completed within 3 days. Posts are fixed, gutters and louvres fitted, motor and power connected and tested.
Short answer
Installing a bioclimatic pergola has five stages: survey, made-to-measure production, erecting the structure, louvre–motor–electrical connection and testing. Production is packed in about 25 days; on-site installation usually takes 1 day and is completed within 3 days. As an authorised Albert Genau manufacturing dealer, SkyArt Group installs with its own team.
Installation stages
| Stage | What happens | Time |
|---|---|---|
| 1. Survey | Measurements, floor, wall fixing, power point; load calculation | Quote the same or next day |
| 2. Production | Made-to-measure profiles, louvres and mechanism; colour and accessories chosen | About 25 days |
| 3. Structure | Posts fixed to the floor, beams and gutters on all four sides fitted | Usually 1 day on site; completed within 3 days |
| 4. Louvres, motor, power | Louvres fitted, motor and mechanism connected, remote paired | |
| 5. Test and handover | Louvre opening, drainage and remote tested; use explained |
1. Survey: size, floor and load
Our team measures the area and checks the floor for the posts and the wall fixing points. Beam section and number of posts are set by the span; systems are calculated for 50–60 kg/m² snow load and 50 kg/m² wind load. A single unit is up to 36 m² (max 10 m deep, 7.80 m rear width); larger areas use several units. The survey is free.
2. Design and production
A drawing is made to size; EcoSky, piston or scissor mechanism, colour and accessories are decided. Differences are in bioclimatic pergola models.
3. Erecting the structure
- The system can be wall-mounted or freestanding on four posts. How the posts are fixed is decided at the survey according to the floor.
- A bioclimatic pergola works without a slope; at most about 5 cm level difference is given to direct water (pergola slope and height).
- Post height is made to order; posts above 3.5 m are reinforced.
- Rainwater runs from the gutters down inside the posts, draining freely or through a pipe (drainage and gutter cleaning).
4. Louvres, motor and power
Louvres are fitted and the motor is connected to the mechanism by belt (T-16 belt on the piston system; on systems wider than 5 m the motor tube is supported in the middle). LED lighting, if any, is commissioned and the remote paired; the system can be linked to home automation. Voltage fluctuations can damage the electronics, so we recommend a voltage regulator.
5. Test and handover
Louvre opening (up to 110° on the piston system), drainage and the remote are tested. At handover we explain the rules: keep louvres closed in rain, snow and wind, and service every 6 months.
What you need to prepare
- Power: A supply next to the system for the motor and lighting.
- Floor: A solid floor for the posts; the customer prepares the floor, we set the post positions.
- Permissions: In apartments, the management plan and owners' consent; check with your municipality (permit guide).
- Access: A route to carry materials to roof terraces; a crane is planned if needed.
Timing: how long does a bioclimatic pergola take? Specs: sizes and features. Zip screens for the sides can be added to the same installation plan. Request a free survey.